Personal References - documentation preparation and commissioning

  • DEZA - Valašské Meziříčí (Czech rep.): 2x120 t/h; oil/gas
  • Tp – Martin (Slovakia): 75 t/h; coal
  • TŽ – Třinec (Czech rep.): 2x160 t/h; fluidised bed (coal)
  • ŽOS – Vrútky (Slovakia): 25 t/h; gas
  • ENO – Nováky (Slovakia): 125 t/h; fluidised bed (coal)
  • BEBA – Bánovce nad Bebravou (Slovakia): 2x4 t/h; gas
  • Feldberg (Germany): 2x12,5 t/h; waste
  • ENO – Nováky (Slovakia): 110 MW; coal
  • Tp – Malešice (Czech rep.): 2x55 MW; coal
  • Tp – Zlín (Czech rep.): 125 t/h; fluidised bed (coal)
  • BIOMASSE – Strongoli (Italy): 2x81 t/h; fluidised bed (woodchips)
  • Mittal Steel – Ostrava (Czech rep.): 230 t/h; blast furnace gases
  • IRIDE Energia – Torino (Italy): 3x152 t/h; gas
  • BIOMASSE – Crotone (Italy): 2x40 t/h; woodchips
  • CCPP – Levice (Slovakia): 80 MW
  • ENI Saipem – Awa Paloukou (Congo): off shore oil platform
  • EVO – Vojany (Slovakia): 2x325 t/h; fluidised bed (coal)
  • V. Erömü - Oroszlany (Hungary): 3x240 t/h; coal
  • Tp - Eszak Buda (Hungary): 3x30 MW; cogeneration
  • TEC - Starobeshevo (Ucraina): 760 t/h; fluidised bed (coal)
  • Tisza II.-AES (Hungary): 670 t/h; oil/gas
  • Emethanex Damietta 1 (Egypt): emethanex plant
  • Irahshahr (India): 4x64 MW; oil
  • Khulna (Bangladesh): 110 MW; oil/gas
  • Gera (Germany): 5x50 MW; gas
  • Armant (Egypt): 100 t/h; bagassa/oil
  • Maritza (Bulgaria): 235 MW; coal
  • Litvínov (Czech rep.): 125 t/h; coal
  • Plzeň (Czech rep.): 100 t/h; coal
  • Malešice (Czech rep.): 2x60 t/h; waste incinerator
  • CCPP Balloki (Pakistan): 220MW
  • ENO Novaky (Slovakia): steam lines from STs
  • En. Třinec (Czech rep.): 80 t/h; blast furnace gases
  • SCPP Dante (Slovakia): 50MW
  • ENO Novaky (Slovakia): cooling water
  • Bahia Las Minas (Panama): 150MW; coal

e.t.c.